How a Major Oil & Gas Company Reduced Maintenance Annual Labor Costs on Mainline Units $228k

By: 
Nexus Global

Nexus Global was engaged by the client to conduct an on-site strategy review of the Planned Maintenance activities for the client’s mainline units. The client recognized that the existing PM strategy was in need of review and were looking for a robust and cost effective method of improving it’s existing strategy.

The main requirement of the review was to maximize the equipment uptime and minimize the maintenance costs for the mainline units without negatively impacting the reliability or safety of the equipment. There were 33 identical mainline units, so the new strategy and any maintenance cost reductions would be applied to all. 


Submit Form To Download
The Case Study

Nexus Global needs the contact information you provide to us to contact you about our products and services. You may unsubscribe from these communications at anytime. For information on how to unsubscribe, as well as our privacy practices and commitment to protecting your privacy, check out our Privacy Policy.